Your manufacturing supply agreement names a price and delivery date. But when defective parts stop production, who pays?
Without clear specs, rejection procedures, and replacement deadlines, that fight starts when you can least afford it.
What Should a Manufacturing Supply Agreement Include?
Define what the supplier must deliver, how you will test it, and what happens when it fails. “Good quality” is an argument. Dated drawings, tolerances, and test requirements are measurable obligations.
In California, goods contracts priced at $500 or more generally require a signed record indicating a sale. Enforcement generally stops at the quantity stated, subject to exceptions. Put quantities in writing—not just forecasts.
- Set document priority. Say whether the agreement, specifications, or purchase order controls. The last document sent does not automatically control.
- Control changes. Require written approval for material substitutions, tooling changes, and subcontracting.
- Set inspection and notice procedures. Specify the inspection window, notice recipient, and evidence required.
- Price the failure. Allocate testing, sorting, return freight, replacement, and substitute-purchase costs. Set replacement deadlines and review liability caps.
There is no universal rejection deadline. Rejection must occur within a reasonable time, with timely notice to the seller. Identify defects and preserve photos, test results, lot numbers, and samples. Rejection does not automatically authorize disposal.
For many single-delivery sales, nonconforming goods may be rejected, subject to contract terms and legal limits. Sellers may have cure rights; installment deliveries follow different rules. Do not treat every defect as permission to cancel.
Acceptance changes your options. Warranty claims may survive, but you must notify the seller of breach within a reasonable time after discovery—or when you should have discovered it. Separate incoming inspection from continuing warranty protection.
Have a California business contracts attorney test the agreement against a failed shipment before you sign—not after production stops.
Talk to a California business attorney
Fix your supply terms before the next defective shipment tests them. Schedule a free consultation or call (424) 603-8888.
This article is attorney advertising and provides general information only. It is not legal advice and does not create an attorney–client relationship. The law changes, and this article reflects the law as of its publication date. Every situation is different — contact us to discuss how the law applies to your exact circumstances. See our full disclaimer.

